1 / 3 ImagesPreparing the page
Preparing the page
1 / 3 ImagesProject Detail
A 36,000 m² concrete yard designed for intensive production and vehicle traffic was completed at the Detaş Group galvanized wire factory. The project combined fiber reinforcement material support, concrete placement, precise level control with laser screed equipment and professional surface finishing.
Concrete class, site use, moving loads and the construction schedule were evaluated together to plan the material and placement process across the large area. Uniform fiber distribution, correct mixing time and uninterrupted site organization were central to the quality target.
36,000 m² external factory yard concrete
Fiber reinforcement material and application support
Level-controlled laser screed placement
Surface finishing for industrial use
Planned joints and coordinated site organization
Completed within a one-month application schedule, the project is a strong reference for the importance of combining appropriate materials with coordinated execution on large industrial sites.
A 36,000 m² fiber reinforced factory yard for Detaş Group with material support, laser screed placement and professional surface finishing.